110kV line in Shymkent (Kazakhstan)

Complete reconstruction of a 110 kV line and 110 / 10 kV substation, including the replacement of old metallic lattice structures with composite poles.
The line served the increasing electricity needs of the city of Shymkent, third largest city of Kazakhstan with more than 1 million inhabitants, and an important industrial center.
HVCRC® was selected by the utility after evaluating various options to reduce line losses and increase the line maximum ampacity.

Year: 2012

Project: Reconstruction of 110 kV line “Kyzyl Sai”

Customer: Alatau Zharyk

Location: Shymkent, Kazakhstan

Voltage: 110kV

Conductor length: >100km

Old Conductor:  AC-95

New Conductor:  HVCRC® 230/28 (Linnet size)