110 kV line rebuild in Kazakhstan

Asia & Oceania Rebuild HVCRC 90 – 125 kV

Year: 2012
Customer: Alatau Zharyk
Location: Almaty area, Kazakhstan
Voltage: 110 kV
Conductor length: >100 km
Old Conductor:  AC-95
New Conductor:  HVCRC 230/28 (Linnet size)

Complete reconstruction of a 110 kV line and 110 / 10 kV substation, including the replacement of old metallic lattice structures with composite poles.
The line served the increasing electricity needs of an important industrial and population center.
HVCRC® was selected by the utility after evaluating various options to reduce line losses and increase the line maximum ampacity, marking one of the very first HVCRC projects.