Reconductoring a 110 kV line to extend its lifetime for CGES in Montenegro

Europe Reconductoring HVCRC 90 – 125 kV

Year: 2024
Customer: CGES – CRNOGORSKI Elektroprenosni Sistem
Location: Perućica – Podgorica, Montenegro
Voltage: 110 kV
Conductor length: >100 km
New Conductor: HVCRC 190-28 (Rovinj size)


This project was the first advanced reconductoring project in Montenegro.
This 110 kV line connects the Perućica hydro power plant to the capital city of Montenegro, Podgorica.
The HVCRC® reconductoring has not only extend the life of this solviet-era power line but also doubled its capacity, while reducing electrical losses and solving sag and reliability issues.

The conductor was stranded by Nexans, and installed by Elnos Group with Tesmec machines and fittings from Dervaux (Sicame Group).

Results:


– Doubled ampacity with existing structures
– Reduced losses at same ampacity
– Old and damaged line secured with a new conductor

In the video below, Elnos Group’ site manager Luka Šaranović shares his feedback on this HVCRC conductor installation in a very difficult rocky landscape.