154 kV line in Seogochang (Korea)

KEPCO Electric Power Research Institute (President Kim Dong-seop) conducted a comprehensive evaluation of reliability and constructability prior to the introduction of a new capacity-increasing new material cable that is cheaper than the existing increased-capacity cable and can double the transmission capacity. A real system empirical study on a 154kV commercial line in Seogochang was conducted, selecting 3 HTLS cable technologies, including HVCRC®.
The line was placed into service for KEPCO in South Korea on May 31, 2014.

Year :  2014

Project :   Hong-ong – Seo-chang

Customer :   KEPCO

Location :   Seogochang, Korea

Voltage :   154 kV

New Conductor :  HVCRC 530/71 (Drake size)

Stranding partner : LS Cable & System

https://www.kepri.re.kr:20808/board/news_data/663