НАШИ РЕШЕНИЯ И ПРОДУКТЫ

НАШИ РЕШЕНИЯ ПО УВЕЛИЧЕНИЮ ПРОПУСКНОСТИ ЛИНИЙ, ПОВЫШЕНИЮ БЕЗОПАСНОСТИ И СНИЖЕНИЮ ПОТЕРЬ ЭЛЕКТРОЭНЕРГИИ НА ЛИНИЯХ ПЕРЕДАЧИ И РАСПРЕДЕЛЕНИЯ ПО ВСЕМУ МИР

HVCRC® advanced conductors

HVCRC® advanced conductors

A new generation of efficient and sustainable conductors for Transmission & Distribution lines

Voir plus

ACPR Losag Advanced reconductoring — EPC feedback & aerial footage

Nice aerial footage & EPC feedback from an ongoing advanced reconductoring project on a 220kV line for Transelectrica in Romania.

For this project in a mountainous area with a continental climate, ACPR Losag was selected for its outstanding ice load performance.

This is the first advanced reconductoring project in Romanian history, following our field tests in October 2023.

• Composite Core from Epsilon Cable

• Conductor stranding by Nexans

• Accessories from Dervaux / Sicame Group

• Installation by Electromontaj S.A. with field support from Nexans & Epsilon

НОВОСТИ

CurrENT Europe and Compass Lexecon’s latest study, supported by Breakthrough Energy

Deploying innovative grid technologies can increase transmission and distribution capacity by up to 20-40 %, according to CurrENT Europe and Compass Lexecon’s latest study, supported by Breakthrough Energy

This first of its kind study at a European level underscores the pivotal role that deploying innovative grid technologies can have in helping Europe achieve its decarbonisation goals.

The study examines eight different innovative grid technologies:
· Advanced conductors ➡ HVCRC and Losag conductors
· High temperature Superconductors
· Storage as a transmission asset (SATA)
· Dynamic Line Rating
· Advanced Power Flow Control (APFC)
· Grid inertia measurements
· Digital Twin
· Flexibility management software solutions

You can download the full «Prospects for Innovative Grid Technologies» study

ACPR Losag Advanced reconductoring — EPC feedback & aerial footage

Nice aerial footage & EPC feedback from an ongoing advanced reconductoring project on a 220kV line for Transelectrica in Romania.

For this project in a mountainous area with a continental climate, ACPR Losag was selected for its outstanding ice load performance.

This is the first advanced reconductoring project in Romanian history, following our field tests in October 2023.

• Composite Core from Epsilon Cable

• Conductor stranding by Nexans

• Accessories from Dervaux / Sicame Group

• Installation by Electromontaj S.A. with field support from Nexans & Epsilon

Middle East Energy Dubai 2024

Interested in advanced conductors for overhead lines ?
Let’s connect during Middle East Energy Dubai, on 16-18 April 2024

Feel free to contact HVCRC® representative Eslam Rabie to schedule a discussion

HVCRC® reconductoring in Montenegro — 110KV line for CGES

Beautiful aerial images from our latest HVCRC® reconductoring project in Montenegro, and interesting feedback from Elnos Group site manager Luka Šaranović on this HVCRC® installation in a very difficult rocky landscape.

This 110kV line connects the Perućica hydro power plant to the capital city of Montenegro, Podgorica. The HVCRC® reconductoring will not only extend the life of this solviet-era power line but also double its capacity, while reducing electrical losses and solving sag issues.

Congratulations to the team involved, from design to installation !

ПРИХОДИТЕ И УЗНАЙТЕ, КАК МЫ МОЖЕМ ПОСОДЕЙСТВОВАТЬ ВАШЕМУ ПРОЕКТУ

Contact