Reconductoring a private 220 kV transmission line for BALCO’s aluminium production site in India

Asia & Oceania Reconductoring HVCRC > 220kV

Year: 2026
Customer: BALCO / Vedanta
Location: Korba, Chhattisgarh, India
Voltage: 220 kV
Conductor length: 32 km
New Conductor : HVCRC 560-60 (Hamburg-Plano)

Project context

BALCO operates a major aluminium production site in Korba, India, supplied through a dedicated high-voltage transmission network connected to captive power plants serving the facility.

The existing 220 kV transmission line had to be upgraded to support growing electricity demand from the industrial operations. As an electro-intensive aluminium production facility, the site requires a continuous and highly reliable power supply to sustain its smelting and manufacturing processes. BALCO’s operations are supported by three captive power plants connected through an internal transmission network. As production requirements increased, the existing line reached its transfer limits, creating the need to enhance the power transmission capacity while maintaining the reliability and continuity of supply essential for round-the-clock industrial operations.

The project therefore focused on increasing power transfers on an existing 220 kV line while preserving the existing infrastructure and ensuring uninterrupted support for BALCO’s industrial activities.

Key challenges of the BALCO 220 kV project

The main constraint was to increase transmission capacity while keeping the existing corridor, avoiding major modifications to the line infrastructure, and minimizing line downtime to ensure the continuity of industrial operations.

As the transmission line forms part of the power supply network feeding a strategic industrial facility, any prolonged outage could have impacted production activities. The upgrade therefore required a solution capable of delivering significantly higher ampacity without requiring tower replacement or extensive civil works.

Project execution & results

HVCRC® composite core conductors were used to reconductor the existing line bringing its maximum ampacity to 1,050 A.

Thanks to its composite core, this conductor technology enables higher operating temperatures with controlled thermal sag, helping maintain the required electrical clearances while increasing ampacity. The solution allowed BALCO to increase the transmission capacity of the existing 220 kV asset while preserving the original line corridor and structure configuration.

The conductor was stranded in India by Shashi Cables using a composite core supplied by Epsilon Cable‘s pultrusion factory in France. Dervaux (Sicame Group) supplied the compression hardware and accessories, while installation works were carried out by Empowertrans.

The reconductoring project was executed on the existing transmission infrastructure with a focus on maintaining installation quality and minimizing operational constraints. The use of HVCRC® conductors enabled installation procedures comparable to conventional overhead conductors while benefiting from the mechanical and thermal performance of the composite core technology. Close coordination between all project stakeholders helped ensure efficient execution of the works within the outage windows available on the industrial network.

The upgraded 220 kV line now supports higher power transfer capacity for BALCO’s industrial operations while retaining the existing transmission corridor.

The project involved the installation of approximately 32 km of HVCRC 560-60 (Hamburg-Plano) conductor on a double-circuit 220 kV transmission line configured with one conductor per phase. The reconductoring solution provides additional capacity to support the site’s growing energy requirements while ensuring the reliability expected for continuous aluminium production operations.