Reconductoring a 115 kV line to power a data-center for CFE, Mexico

America Reconductoring HVCRC 90 – 125 kV

Year: 2025
Customer: CFE – Comisión Federal de Electricidad (Mexico)
Location: Querétaro
Voltage: 115 kV
Old Conductor: AAAC Butte, AAAC Flint
New Conductor: HVCRC 230-28 (Copenhagen / Linnet size)

This reconductoring project was carried out to increase the maximum ampacity of the 115 kV Querétaro I – Campanario transmission line, to support the installation of a new major data center, with EPC works by Grupo Grose for the Comisión Federal de Electricidad.

The project is located in the urban area of Querétaro, State of Querétaro de Arteaga, a short distance north of the capital city of México.
The goal was increase transmission capacity by replacing the existing conductors, in order to meet growing electricity demand while maintaining existing structures and controlling sag in this dense urban environment. This increased capacity and stability are required because the line supplies both the local population and major companies established in the area, as well as data centers.

HVCRC-conductor-installation-Mexico-Queretaro-115kv-line
HVCRC-hardware-accessories-compression-115kv-line-Mexico-Queretaro

Results:

To ensure a safe and smooth installation, preliminary training sessions were conducted by HTLS and HVCRC® field expert Sergio Rojas, which covered installation procedures, inspection of tools and equipment, as well as the assembly and compression of accessories during the project. All Grupo Grose installation teams were trained and certified, marking their first experience installing the HVCRC® conductor.

Due to the steep terrain, installation crews had to adapt their practices, sometimes performing the compression of hardware accessories directly on the line rather than using aerial platforms.

Discover the feedback from Grupo Grose about the project: