The Muara Tawar project required the construction of a new 150 kV transmission line connecting the newly built power plant to three GIS substations on the outskirts of Jakarta, the capital city of Indonesia. As a greenfield development, the line was designed to reinforce Jakarta’s power supply, a function that made reliability and operational continuity non-negotiable design parameters.

Because this line forms part of the Jakarta load loop, and because of the strict sag-control requirements in this suburban area, PLN specified an HTLS solution for the new infrastructure, and HVCRC® composite core conductors were selected to meet both the electrical performance and the physical constraints of the corridor.

Field installation constraints

The defining constraint of the project was maintaining required electrical clearances across a high-density crossing corridor. Span lengths reached up to 390 m and the route passed above both existing distribution and transmission infrastructure, a major highway, and residential areas.

During the line design phase, the primary constraint was to avoid any conductor sag exceeding permissible limits under high operating temperatures or maximum loading conditions, a scenario that could breach mandatory clearances and create safety and operational risk at multiple crossing points.

The secondary constraint was installation feasibility in a mixed suburban corridor with severely restricted ground access, where stringing logistics had to be engineered around existing infrastructure rather than conventional open-field assumptions.

Crossing density clearance enginneering

The most technically demanding section of the route concentrated six crossings within a 2 km corridor, an unusually high density for a line of this type.

Several crossings involved spans above existing 20 kV distribution circuits, with inter-tower spans reaching up to 390 m. One crossing required a span of approximately 130 m above an existing 150 kV transmission line. Each of these configurations imposed independent clearance envelopes that had to be maintained simultaneously under all operating conditions.

Another crossing required particular attention: the Jalan Tol Cibitung-Cilincing (JTCC), a strategic toll-road corridor serving the northeastern Jakarta metropolitan area, connecting industrial zones, logistics hubs, and the Port of Tanjung Priok. Maintaining safe and permanent clearance above an active major transportation artery, with very limited tolerance for sag increase over the service life of the line, was a critical design requirement. 12 years after PLN first installed HVCRC® composite core conductors in Indonesia, the long-term sag behaviour of the HVCRC® technology under high operating temperatures was a key design

On-site constraints and installation support

Beyond the electrical design, the construction phase presented significant logistical challenges. Multiple pulling sections were located in areas bordered by rice fields and existing infrastructure, leaving limited ground space for positioning stringing equipment. These constraints were effectively managed by the EPC contractor, PT Bukaka Teknik Utama Tbk, throughout the project.

Identifying suitable locations for the bull wheel and tensioning equipment while maintaining the required pulling geometry demanded careful sequencing of the installation plan. The restricted working envelope at ground level meant that standard stringing logistics had to be adapted to the specific constraints of each section.

Before and during the installation phase, Epsilon Cable’s field experts provided remote and on-site installation support and technical training to the local installation teams, covering conductor handling practices, installation procedures, and field coordination.

As the hardware manufacturer for this project, PLP Indonesia also provided training on the clamping of its compression deadends. This field support helped ensure that conductors and accessories were deployed in line with project

We would like to thank all project partners involved in this project:

• PT. Bukaka Teknik Utama Tbk for EPC works
• Citra Cable for conductor stranding
• PLP Indonesia for compression hardware and accessories

Watch this video for direct feedback from the EPC managers involved in the project:

VEN Y DESCUBRE CÓMO PODEMOS CONTRIBUIR A TU PROYECTO

Contact