Reconductoring a 150 kV line to double its ampacity for PLN in Indonesia

Asia & Oceania Reconductoring HVCRC 125 – 220 kV

Year: 2017
Customer : PT PLN
Location : Sumatera Utara, Indonesia
Voltage : 150 kV
Conductor length: 500 km
Old Conductor:  ACSR
New Conductor :  HVCRC/TW Hawk 

Major reconductoring project on a 150kV line across tropical jungles in rural North Sumatra, Indonesia.

Results :

– Ampacity doubled with existing structures
– Reduced losses at same ampacity