Reconductoring an 88 kV distribution line in a dense urban area in Johannesburg, South Africa

Africa & Middle East Reconductoring HVCRC < 90 kV

Year: 2015
Customer: City Power South Africa
Location: Kelvin Orchards, Johannesburg, South Africa
Voltage: 88 kV
Conductor length: >100 km
Conductor used: HVCRC 320/40 (Lisbon size)


The project objective was to reconductor a key segment of the transmission grid around the City of Johannesburg to reduce congestion.
High Ampacity Low Sag HVCRC conductor was used as a replacement of conventional conductors and strung on the existing towers to resolve the difficult Right of Way problem African utilities face.

Result:

The increased ampacity of the HVCRC® Conductor provided City Power Johannesburg with a solution for a critical congestion problem in the Johannesburg grid.
This project demonstrated that HVCRC conductors provide many advantages for construction of South Africa’s Smart Grid and supports the concept of a modern, more efficient and more reliable grid.

Project installed by Edison Power Group, a leading turn-key contractor in Africa.